Battery Stack Emulator
Nuvation Energy Battery Stack Emulator provides the ability to emulate the Nuvation Energy BMS to allow early engineering development.
- To purchase please contact sales.
- If you need technical support, please contact our product support team.
Get Started
INSTALLING AND SETTING UP THE BATTERY STACK EMULATOR
- Download the following:
- Product Manual – Contains the full instructions for your Battery Stack Emulator.
- Review Safety Warnings: Prior to installation, please review the full set of safety warnings provided in the Product Manual.
- Connect the Battery Stack Emulator: Follow the ‘Electrical Connections’ section in the Product Manual to connect to the network and UPS
- Power on the Battery Stack Emulator: The Battery Stack Emulator can now be powered on, and the Operator Interface can be launched.
Follow the ‘First Power-Up’ section in the Product Manual. - Launch the Operator Interface: The dashboard can be accessed through the URL http://ncontroller-<serial_number>.local, where the <serial_number> is located on the label on the underside of the Battery Stack Emulator.
Follow the ‘Using the Operator Interface’ section in the Product Manual.
USING THE BATTERY STACK EMULATOR
- Review Product Operating Limits: Exceeding the ratings of the product will damage the system.
Please review the ‘Operating Limits’ section in the Product Manual. - Using the Operator Interface: The dashboard can be accessed through the URL http://ncontroller-<serial_number>.local, where the <serial_number> is located on the label on the underside of the Battery Stack Emulator.
Follow the ‘Using the Operator Interface’ section of the Product Manual.
Downloads and Technical Documents
DOCUMENTS
- Battery Stack Emulator – Datasheet | Last Updated 2024-07-16
- Battery Stack Emulator – Product Manual | Last Updated 2024-07-16