Skip to main content
Uncollapse Menu

Fremont, USA

Battery Management System Retrofit

A client requested Nuvation Energy to replace their OEM BMS to improve SOC reporting to their Demand Charge Management Controller. Nuvation Energy replaced the OEM BMS with Nuvation Energy’s High-Voltage BMS, designed a custom adapter that enabled reuse of existing voltage and thermistor cables, and provided on-site system integration services.

Project Details:

  • Nuvation Energy High-Voltage Battery Management System
  • 120kW /288 kWh in a 10ft container with 4 stacks 
  • Nuvation Energy designed custom adapter
  • On-site system integration services
Contact Us

A member of our sales team will contact you within one business day to provide you with the help you need!