Fremont, USA
Battery Management System Retrofit
A client requested Nuvation Energy to replace their OEM BMS to improve SOC reporting to their Demand Charge Management Controller. Nuvation Energy replaced the OEM BMS with Nuvation Energy’s High-Voltage BMS, designed a custom adapter that enabled reuse of existing voltage and thermistor cables, and provided on-site system integration services.
Project Details:
- Nuvation Energy High-Voltage Battery Management System
- 120kW /288 kWh in a 10ft container with 4 stacks
- Nuvation Energy designed custom adapter
- On-site system integration services